Dongying Hydrogenation Reactor Transport

Case details

Cargo Specification:

Hydrogenation Reactor: ?4.73*32.5M,957T, 2 units;

Hydrogenation Reactor: ?4.73*22.5M,655T, 1 unit


Project time:2016.05-2016.11

Logistics Route: Shandong HHRC- Shandong Jincheng Petrochemical Group


project

Applied Equipment:

Mercedes Benz 4160+Goldhofer 4 colums 27 axles+Mercedes Benzs2354


Mission Difficulties:

Bridge survey, force calculation, set up bridge enforcement plan and equipment loading plan, apply for administration approval, and the execution of bride enforcement;

As height limited, slide is the only way for passing several bridges, we made special sliding plan and equipment for such heavy cargo;

The mass axle trailers and gantry crane were applied in the project, complex coordination for the whole equipment and related work forces.