top of page

Past Projects

Door to port logistics for pulp equipment fro

Case details

Cargo:

2nd machinery of steel pipes, structures, valves in 50*40’OT


Break bulk cargo:

1. 13552 CBM in total;

2. Max length/width/high/weight: 21.3M/7.2M/4.6M/48.3T

Project time:2013.03-2013.08

Logistics route: Ya’An, China – Singapore, Singapore



Equipment applied:

1. The complex of custom clearance, especially for the classification in HS code;

2. The coordination of various transportation mode for various OOG cargo;

3. Limited time;


Live picture


bottom of page