Industrial gas cold box, Shanghai factory to

Case details

Cargo Specification:

PHX Package Assembly, 22.45*5.79*4.50m, 136.08ton

Lower Section of Column Package Assembly, 21.79*5.79*4.50m, 140.61ton

Lower Section of Column Package Assembly, 22.02*5.79*4.50m, 131.54ton

Lower Section of Column Package Assembly, 27.49*5.79*4.50m, 131.54ton


Project time:2016.06-2016.09

Logistics Route: Fengxian District, Shanghai- Nanjing Chemical Industrial Park


Equipment applied:

Applied Equipment:

1. 4 axles + connecting beam + 6 axles multi axle trailer;

2. gantry crane capacity up to 1400 tons;

3. 1000T offshore deck barge;

4. 600 tons mast crane+500 tons floating crane;


Mission Difficulties:

Cargo is over-width and over-height;

The lifting point of the cargo is asymmetric and the distance between the lifting points is too long; special lifting plan and tools made;

Transport time needed to be closely coordinated wiht the installation plan on the site;