Past Projects
Industrial gas cold box, Shanghai factory to
Case details
Cargo Specification:
PHX Package Assembly, 22.45*5.79*4.50m, 136.08ton
Lower Section of Column Package Assembly, 21.79*5.79*4.50m, 140.61ton
Lower Section of Column Package Assembly, 22.02*5.79*4.50m, 131.54ton
Lower Section of Column Package Assembly, 27.49*5.79*4.50m, 131.54ton
Project time:2016.06-2016.09
Logistics Route: Fengxian District, Shanghai- Nanjing Chemical Industrial Park
Equipment applied:
Applied Equipment:
1. 4 axles + connecting beam + 6 axles multi axle trailer;
2. gantry crane capacity up to 1400 tons;
3. 1000T offshore deck barge;
4. 600 tons mast crane+500 tons floating crane;
Mission Difficulties:
Cargo is over-width and over-height;
The lifting point of the cargo is asymmetric and the distance between the lifting points is too long; special lifting plan and tools made;
Transport time needed to be closely coordinated wiht the installation plan on the site;