top of page

Past Projects
Liaoyang Petrochemical Project
Case details
Cargo Specification:
5460x18100mm 500T
5460x22500mm 650T
5410x22500mm 630T
5410x22500mm 615T
Project time:2017.09-2017.11
Logistics Route: Bayuquan port-Liaoyang Petrochemical Company
Equipment applied:
Applied Equipment:
Benz tractor+ GOLDHOFER 22 axis+700 tons Bridge beam+ GOLDHOFER 22 axis+ Benz tractor
Mission Difficulties:
The cargo is transported on the freeway and is overweight which need coordination of various departments like RTA.
Cargo strengthen can’t match the passage requirement of the bridges and there are so many bridges on the way.
It is the largest bridge beam transport domestically.
Live picture
bottom of page


