Does the shipping industry recover?
- stonez40
- May 9, 2024
- 1 min read
Shanghai Zhenghe was commissioned by a French customer to successfully complete the equipment transportation required for the construction of the first Iranian fertilizer plant. The project has a total of 5 delivery plants. After Zhenghe received the commission from the customer, it actively coordinated factories, docks, and shipping companies to complete the collection and porting work of the goods within one week, loading and transportation in the factory, and the terminal. During the unloading and dock loading operations, special personnel were arranged to follow up the entire process. All the cargoes were successfully and safely completed and were highly praised by customers.
The following is the basic information of the project;
Cargo specifications: 73, 1000T, 6063CBM
Implementation time: 2017.09
Transport route: Domestic factory - Shanghai port
Use equipment: various types of trucks
Project difficulties:
Consigned shipments of goods require more coordination;
The factory does not have relevant shipping experience, and Shanghai Zhenghe needs to arrange a special person to be responsible for loading the vehicle;
Some of the goods were precision equipment. Shanghai Zhenghe used the purchase of 40’ SOC as a transportation package. The program was quickly approved by a third-party inspection agency.